Most costly disputes in imported machinery are configuration mismatches, not broken machines. Verify the actual unit against a written specification sheet before the container is sealed: identity, dimensions, function, battery, documents and loading record.
Verified statements only — unverified specifications are marked to confirm, never estimated.
Start with the nameplate. Match the model code, serial number and rated capacity against the purchase order, then photograph the plate and the whole machine. Wrong-model shipments happen even with otherwise reliable suppliers; a photograph tied to the order is the cheapest control you have.
Walk the machine against the signed specification sheet. The items that most often differ are dimensional or electrical rather than visible at a glance:
Operational testing matters more than appearance. Lift a load to full height and hold it, check lowering control, travel and braking, steering, mast tilt and hydraulic leakage. For lithium models, observe BMS behaviour and charger function on the specified supply. A slow hydraulic drip at the factory becomes a puddle in the buyer's warehouse.
Request a document set that corresponds to the exact model and configuration being shipped, not to a neighbouring model in the same family. A declaration or certificate issued for another machine does not cover the unit on the truck.
Agree in writing how the mast is disassembled and reassembled, check wheel chocking and strapping, and keep a photo record of the container as loaded. Repeat the functional checks on arrival and compare the delivered unit with the pre-shipment record before acceptance.
An inspection is only as good as its baseline. Before ordering, send the load and load centre, aisle or gate width, lift height, shift hours, charging arrangement, supply voltage and frequency, and destination port. Ask for a written specification in return, then use that document as the inspection checklist. WyllBell issues written specifications on request; no figures are published here without the original documents in hand.
Yes. A pre-shipment inspection verifies model identity, configuration, hydraulic function, battery behaviour and export documents while the unit is still at the factory. Correcting a mismatch before loading is far less costly than repairing or re-shipping after arrival.
No. Buyers should also request the declaration of conformity, instructions in the required language and documentation that matches the exact model and configuration. A conformity logo without matching documents leaves the importer without evidence for customs or safety checks.
The charger must work on the destination supply. Specify input voltage and frequency (for example 50 Hz or 60 Hz) on the purchase order and test the supplied charger before loading; a mismatched charger is a common and expensive oversight.
The declaration of conformity, operator manual, parts catalogue, wiring diagram, warranty statement, certificate references and packing list should all name the exact model and configuration. Documents for a different machine in the same product family do not establish conformity for the delivered unit.
Configuration mismatches rather than broken machines: a mast of the wrong height, shorter forks, a charger with the wrong voltage, or a substituted engine or battery. A written specification sheet plus an inspection against it is the practical control.
Self-propelled trucks powered by an electric motor are generally classified under 8427.10, internal-combustion trucks under 8427.20, and parts under 8431.20. Confirm the final classification and any destination-specific measures with your customs broker.
A model number alone does not guarantee a correct configuration. Send the load, aisle or gate width, lift height, shift hours and destination port; we return a written specification and price.
Load, aisle or gate width, lift height, shift hours and destination port are enough to start.