Respondemos el mismo día hábil

CPD-05 vs CPD-08

Two sizes of the same frame. The difference that decides the order is usually aisle width or the weight of a full pallet — not the number on the plate.

CPD-05CPD-08
ModelCPD-05CPD-08
Rated capacity0.5 t0.8 t
capacity0.5 t0.5 t
standard
powerElectricElectric

Rows that differ are marked. Rows without a mark are identical on both builds.

Choose CPD-05 when

Three-wheel, 0.5 t. Bought where the aisle is under 2.2 m and the load is a euro pallet at low height. The narrowest turning circle in the range.

The building is the constraint: floor loading, door width, or a mezzanine that will not take the heavier chassis. CPD-05 is also the cheaper unit, so a fleet that never loads to the plate should not pay for the frame it does not use.

CPD-05 specification

Choose CPD-08 when

Three-wheel, 0.8 t. The step up from 0.5 t for a workshop that occasionally lifts a full drum or a machine skid.

The load is the constraint: pallets that arrive over-weight, attachments that shift the centre of gravity forward, or a mast tall enough that residual capacity falls away at height. Buying one size up is cheaper than a second handling step.

CPD-08 specification

Si no sabe cuál

Send the aisle width, the load and the lift height. We answer with the model and the reason, not both brochures.